SIP Homes typically take far less time to build than a traditional stick-frame home. |
Styrofoam Insulated Panel Homes require less construction time.
SIP Home Construction - Series 4
This series of pictures shows the walls being set into place.
Special attention to fitting the panels together side-by-side sometimes requires adjustments.
SIP Home - Styrofoam Insulated Panel Home Construction |
Once the building contractor has put all the walls and ceiling panels in place its time to install the electrical circuits and wiring. It is best for the sub-contractors to be on site for part of the building process so they can begin to plan for their installation process. |
![]() |
||
Each SIP Home is engineered and the SIP Panels are delivered pre-cut to size ready for installation. The concrete foundation was equipped with hold down bolts used to fasten a 2 x 6 plate on top of the slab which served as the bottom anchor then 6 x 6 posts (shown above) were installed between the panels which will be used for a splice and structural support for the upper floor. | ||
![]() |
![]() |
![]() |
Once the exterior walls are in place the remaining interior walls are constructed to complete each area.
A special heating tool is used to make a channel to accommodate a 6 x 6 post. |